Industrial

Malaga Logistics Warehouse

Client: Confidential Logistics Operator

Turnkey construction of a 4,500 m² logistics warehouse at the Parque Tecnológico de Andalucía (Malaga).

The challenge

The client required a comprehensive solution covering everything from basic engineering through to final handover, within a tight eight-month programme.

Our solution

Coimpul took on full project management: structural design, fabrication of the steel structure in our workshop, on-site assembly and fit-out. The warehouse features a portal steel frame, sandwich panel roofing and composite panel façades.

Results

  • Delivered on time: 8 months from project start
  • 380 tonnes of steel structure
  • CE certification to EN-1090
  • 4,500 m² of usable floor area

Have a similar project? Let's talk.

Nationwide coverage · CE-certified steel structures.