Infrastructure

Granada Pedestrian Footbridge

Client: Granada City Council

A 45-metre steel pedestrian footbridge with ramp and lift access, designed to connect two neighbourhoods separated by a busy road.

The challenge

Designing a structure that met all the technical requirements of a public works project: seismic calculation, universal accessibility and maximum durability in an urban environment.

Our solution

Main structure in S355 steel with hot-dip galvanised protection. Open-grid flooring and stainless steel finishes on contact elements. The entire project was developed using BIM methodology.

Results

  • 45 metres long and 3 metres wide
  • 100% accessibility compliant with current regulations
  • Estimated service life: 50+ years
  • Recognised in the municipal public works competition

Have a similar project? Let's talk.